Projects
PIPELINE PROJECT FOR ENI, IRAQ
Scope of work :
DETAILED ENGINEERING SERVICES FOR ENI WATER INJECTION NETWORK.
FEED VERIFICATION and detailed design of 45KMS of water injection pipeline including PFD and P&ID updating, pipeline engineering, stress analysis, alignment sheets,
Civil support/Anchor block design, Earthing layout, Fencing layout etc.
Year : 2019
DESIGN OF PIG LAUNCHER/RECEIVER
Scope of work :
Preparation of design calculation report for PIG Launcher/ Receiver using the latest PV Elite software
Year : 2019
PREPARATION OF PIPELINE ALIGNMENT DRAWINGS & STRESS REPORTS
Scope of work :
1 Tank Lifting Calculation for Annular plate replacement of tank size 31.5m dia. x16.5 m height cone roof type
2.Checking the feasibility of exiting roof structure to support the additional loads due to new nozzles with 3 Nos. of flame arrestor
Year : 2018
ADEQUACY CHECK OF ROOF STRUCTURE FOR ADDITIONAL LOADS
Scope of work :
1 Tank Lifting Calculation for Annular plate replacement of tank size 31.5m dia. x16.5 m height cone roof type
2.Checking the feasibility of exiting roof structure to support the additional loads due to new nozzles with 3 Numbers of flame arrestor
Year : 2018
Pre-FEED Study for Gas Processing Facility GPF
Carry out the Pre-FEED study for a new Gas Processing Facility along with gas export pipeline.
The package items involved in the Pre-FEED study are Inlet Separators, Compressor Package, TEG Unit Package, Gas Metering with analyzers, Pig Launcher / Pig Receiver, Utility Packages- Fuel Gas, Instrument Air, Chemical Injection System, Power Generation, Potable Water, Other Systems- Control System, Open / Closed drain System, Overpressure protection system.
Year- 2018
Pre-Bid Engineering Services related to Civil Structural works
Prepare the required civil /structural drawings to provide clarity for the civil contractor on the scope and also to prepared MTO.
Year- 2018
Pre-Bid Engineering Services for New Gas Sweetening Facility at BS-171 West Kuwait
Pre-Bid Engineering support for New Gas Sweetening Facility and Sulphur Recovery Unit at West Kuwait in Process, Instrumentation, Piping, Electrical, Mechanical, Civil & Structural and HSE
Year – 2018
Chilled Water Piping Network
Preparation of shop drawings of Piping, Piping GAD, Stress Analysis (Caesar II) and Hydraulic Study (Pipenet)
Year – 2018
Process Design Review ELOMP Phase-IV
Review & validation of process calculation, data sheet, P&ID, PFD, UFD etc
Year- 2017
Gas Plan Facility E&I
Scope of Electrical & Instrumentation like lighting layout, cable block diagram, cable schedule, lighting datasheet, F&G datasheet, PAGA speaker system etc. Scope also included PDMS modelling of the E&I part.
Year- 2017
WK GSF Expansion Works , New Train
Detailed Engineering to further enhance the capacity of the Gas Sweetening Facility by adding a new Gas Treating Train of 40 MMSCFD.
Year- 2017
WARA Pressure Maintenance Project
3D Modelling, subsequent design and engineering in Piping, Civil, Electrical, Instrumentation and HSE for EWDP and Manifolds/ well heads.
Year- 2017
Tube Leak Pressure Protection on Chiller Exchanger DGP Train 1
Engineering evaluation of installing a tube leak pressure protection on the exchanger and connection to Flare, Flare study, sizing of PSV and to address tube rupture scenario during shutdown.
Year- 2017
Pre-Bid Engineering for existing Pilot Gas Lifting System Expansion
FEED verification and endorsement, preparation of datasheets/ specifications for procurement of items/ equipment/ packages, MTO’s, TBE (Technical Bid Evaluations) and clarifications with vendors in Process, Instrumentation, Electrical, Piping, Pipeline, Mechanical, Civil & Structural and HSE
Year – 2017
Engineering services of NG Filter package
Performing Residual Engineering including stress analysis, pipe support and its foundation, filter foundation, Electrical & Instrumentation trench sections modifications, Lighting Facility at NG filter location etc
Year- 2017
Pre-Bid Engineering , H2S Removal
Pre-Bid support for a new gas plant including cost estimation
Year- 2017
Engineering support for Bulk Desander
Performing stress analysis, structural analysis, preparation of skid structural GA drawings, lifting study etc.
Year- 2017
Pre- Bid Engineering Support for Integrated Gas Surface Facilities of Cairn India Vedanta
Pre – Bid Engineering support including FEED Verification, BOQ’s and MTO’s, MR, Technical Clarifications and evaluation of Bids from Vendor
Year- 2017
ONGC Gas Compressor Installations -Ahmedabad, Gujarat
3D Modelling for a Compressor unit along with Civil and Piping design.
Year- 2016
Detailed Design For Providing Booster Compressor And Integration To The Existing System Of Central Process Plant At PTTEP Shams.
Detail engineering for providing booster compressor and associated system into existing system including process, piping, instrumentation, civil and structural scope.
Year- 2016
Engineering Documentation of Operating Management System (OMS) and Operation and Maintenance Manual (O&M) for Gas Treatment and Compression Facility at Oman
Preparation of Operating Management System (OMS) and Operation and Maintenance Manual (O&M)
Year- 2016
Gas Dispersion study for Daleel Gas Plant Facility
Flare dispersion study, Gas generators and Boilers exhaust flue gas study.
Year- 2016
Basic And Detailed Engineering Of QAPCO WWTP Power Distribution & Control System
The additional work of EPCC of WWTP Power Distribution & Control System Project has to be integrated and aligned with WWTP Revamp Project in terms of schedule, in such a way so as to cause no interference to existing operations
Year- 2016
Design and Engineering for Jurassic Production Facility at West Raudhatain, North Kuwait.
JPF Project has a capacity of processing 40 STMBOPD Oil and 104 MMSCFD Gas & 200 TPD of molten Sulphur.
Scope includes Detailed Engineering for the following units-
Oil Separation Plant, Dehydration & Desalting, Crude Stabilization, Metring & Export System, Gas Compression, Vapor Recovery Units, Gas Sweetening and Dehydration, Gas Metering & Export, Plant Refrigeration / Chilled Water System, Sulphur Recovery Unit, Raw Water Treating Plant, ETP, Effluent Water Disposal Systems, Chemical Injection Systems, Steam Systems, Electrical Power Generation Plant, Plant Control & Safety Systems, Data Communication System, Control Room, MCC Building, Workshops, Other Supporting Utilities.
PETROCIL performed Detailed Engineering Services for the above systems including Process, Mechanical, Rotating Equipment, Piping, Electrical, Instrumentation, Civil-Structural and HSE disciplines. The main activities included –Preparation of drawing
Engineering Services for HOLTTF-2, North Kuwait
Engineering Service for UN Heavy Oil Long Term Well Testing Facility is built for one train producing 15 STMBOPD Crude Oil and handling associated sour gas of 10 MMSCFD with maximum inlet concentration 5% (mole) H2s and 3% (mol) CO2.
Year- 2016
Production facility at Kuwait
Firefighting system design (Basic and Detailed Engineering)
Year- 2016
Engineering Services Support
Providing drafting service for various projects.
Year- 2016
SIBA Field Development Project- Flow Assurance Study
To perform flow assurance steady state and transient analysis for the production gathering system and steady state hydraulic analysis for methanol distribution system in SIBA Field development.
Year- 2015
Upgrading GSF to treat 50 MMSCFD gas
Detailed Engineering Upgradation/ Enhancement work for upgrading GSF to treat 50 MMSCFD gas.
Year- 2015
Heavy Oil Production, Temporary Facility for Kuwait Oil Company
Engineering Service for Heavy Oil Facility.
Year- 2015
Engineering services for the Condensate Storage and Loading System
Scope envisages the detailed engineering services and procurement support for the condensate storage and handling system for the 100 MMSCFD gas treatment and compression facility.
Year- 2015
Design and Engineering services for Chemical Injection Skids
Design and engineering services for 3 chemical injection skids involving Process, Piping, Mechanical, Electrical, Instrumentation and Structural scope.
Year- 2015
Corrosion Risk assessment & Overpressure protection
Conducting study for the corrosion risk assessment and over pressure protection for facilities in the gas expansion project.
Year- 2015
Enhancement of existing EPF 50 at North Kuwait
Basic engineering package services for the production enhancement included the preparation of P&ID, PFD, Simulation, Process Data sheets, Functional specifications for various packages such as Gas Sweetening Packages, Gas Dehydration package, Acid Gas incineration Package and Refrigeration Package.
Year- 2014
40 MBOPD Long Term Testing Facilities(LTTF) for KOC
Process Engineering for the Basic Engineering package for LTTF including Simulations, preparation of PFD, P&ID. Process Data Sheets for all equipment, Functional Specifications for various Packages such as Gas Sweetening Packages, Gas Incineration and Refrigeration, Hydraulic Studies, Plot Plan etc.
Year- 2014
De-Bottlenecking study of Gas Sweetening Facility.
To carry out process simulation for the inlet section as well as gas dehydration/ report with the specific design conditions and feed compositions. To obtain the simulation for amine plant from APL. To evaluate the critical equipment for adequacy based on new simulation report. To identify any bottlenecks. Evaluate various options for debottlenecking and suggest suitable modification to achieve new capacity of 50 MMSCFD. To provide technically sound and viable recommendations that are needed to reinforce the plant for operating continuously at the new capacity of 50 MMSCFD. To provide budgetary proposal for revamping the GSF to be capable of handling up to 50 MMSCFD gas instead of the contractually required 40MMSCFD gas.
Year- 2014
GASCO upgrading of substation-19 at MAQTA FEED
Power System Study by using ETAP Software
- Upgrade system model of the electrical equipment for substation -19 and control room
- Load Flow Study
- Short Circuit Study
- Voltage drop during normal and during largest motor starting
- Motor start study (For 288 KW-FW-FW Supply pumps – Existing 2 Nos.)
Year- 2014
EPC Work for Reconnecting & upgrade CRS for Al Mirfa Power Company in Al Ain for Dolphin Energy
Detailed Engineering for piping, electrical & instrumentation specifications, foundation design and drawings, structural design and drawings, grading layout, slab calculations etc.
Year- 2014
Engineering for EPC works for Fire Training Ground at MPS-Habshan
Complete design and engineering of the fire training ground located at Habshan. The disciplines involved were Process, Piping, Mechanical, Civil, Structural, Instrumentation and Electrical. The facility consisted of Simulator Tank, Fuel Tank and Pumps, Shelters, Fire Reel Hoses, Monitors, Hydrants etc. Activities included in Petrocil scope were P&ID’s, Safety Layouts, Data Sheets, Design Calculation of equipment, Piping detail drawing generation, Structural Pipe Support Design & Drawings, Equipment foundation design, Pipe Support Foundation design, Structural Design for various sheds and shelters, Electrical Data Sheets & Specifications, Lighting & Earthing Design and Layouts, Single Line Diagrams, Instrument Data Sheets, Instrument Cable routing & Layout, Modification of CCTV & PAGA system, Discipline MTO’s, etc.
Year- 2014
Engineering Services Support
Survey and As- built Services for the entire EPPCO Terminal Facilities located in Fujairah.
Year- 2014
Engineering for skid mounted desalter packages (2 trains/ 2 stage)
Design and fabrication drawings for desalter, 3 D modeling and piping design/ drawings, skid structural design, lifting analysis, fabrication drawings for 2 stage desalter (2 trains)
Year- 2014
Ex Survey on ABAN VII Jack up Rig Vessel
Engineering Services for EX Surveys of the various items of equipments installed in Aban VII Jack up Rig Vessel
Year- 2013
EPC for additional manifolds at RDS 1&5 in ADOC
Detailed engineering including pipe support structural design, pipe support structural design drawings, pipe support foundation design, pipe support foundation design drawings, access platforms design and detail drawings.
Year- 2013
Fabrication of Manifolds- ASAB Fields in ADCO
Detailed engineering including pipe support structural design, pipe support structural design drawings, pipe support foundation design, pipe support foundation design drawings, access platforms design and detail drawings.
Year- 2013
Instrument Modification in ASR gas Facilities, ADCO
Datasheets for instruments, cable schedule, cable layouts, loop diagrams, inter connection diagrams, I/O Lists, Cause and Effect Diagram, Instrument MTO, P&ID modifications etc.
Year- 2013
Artificial Recharge and Utilization of Ground Water Resources in Liwa Area
Technical Document review of all process/hydraulics related documents and corresponding co-ordination of Technical Document Review
Year- 2013
Flow rate study for export pumps at GPS Chemoil
Preparation of a flow rate study report for the export pumps at the GPS Chemoil terminal. The study included findings, conclusions and recommendations for the low flow rate of the export pumps.
Year- 2013
Validation of Gas Re-injection Project (GRIP) capacity change (From 30 to 60 MMSCFD)
3rd party validation for Cost/size variation of Gas Re-injection Project (GRIP) capacity change (From 30 to 60 MMSCFD). Job involves identifying the equipment/ piping / instruments affected by capacity change and validate cost implication o enable KOC to approve cost variation.
Year- 2013
Engineering Services Support for EF5 Project
Generation of Piping Detailed drawings for all Piping network for the EF5 Project
Year- 2013
Engineering Services for Decommissiong & Demolition of EFX BP Facility Oman
Engineering Documentation and Deliverables such as procedures, plans, drawings, BOQs for Degassing and Demolition of the entire facility.
Year- 2013
Consultancy Services for Benzene Study for FSPO
Review of existing facilities of FSPO and recommendation of the most suitable method for minimizing benzene emissions.
Year- 2013
Engineering Services for EPF
As-built Services for the Early Production facilities
Year- 2012
Hazop Services for Early Production Facility
Participation in HAZOP Sessions
Year- 2012
Front End Engineering and Design for Revamp of Existing 50 MBOPD Early Production Facility Upgrade/ Revamp
Front End Engineering and Design for Revamp of 50 MBOPD Early Production Facility. The project envisages enhancing of production capacity of the pant from 135 MMSCFD & 50 MBOPD to 175 MMSCFD & 70 MBOPD and then to 210 MMSCFD/ 84 MBOPD.
Year- 2012
Pre-FEED for new 50 MBOPD Early Production Facility (LTTF).
Performing Pre- Front End Engineering and Design for a new 50MBOPD Production Facilities for KOC to prepare the tender documents, deliverables including simulations, sizing of equipment, PDFD, PSD and MSD.
Year- 2012
Preparation of Loop Drawings for TV, Gas Compression and Gas Reinjection Project
Preparation of Instrument Loop drawings
Year- 2012
Debottlenecking of Gas Sweetening Facility
Feasibility studies on increasing Production capacity from 40 MMSCFD to 60 MMSCFD.
Year- 2012
Engineering Services Support
Survey and As- built Services for ADOC Offshore Facilities, Mubaraz Island
Year- 2012
Detailed Engineering for Replacement of Acid Gas KOD and associated systems
Engineering for Replacement of Acid Gas KOD and Associated piping, instrumentation & controls, civil/structural Systems
Year- 2012
Design and Detailed Engineering for Surge Tank, Terminal Loading Facility.
Design of Surge Tanks and Detailed Drawing generation and related structural, instrumentation works.
Year- 2012
Design and Engineering Services for Structures
Structural and Civil Design
Year- 2012
Preparation of Commissioning Documents
Preparation of Commissioning documents for modification of Offshore platforms
Year- 2012
Shifting & Upgrading Pumping Station, PWA, Qatar
Review of Process and Control System Documents
Year- 2011
Sucker Rod Pumping System
Pre-Bid Engineering Services
Year- 2011
Cold Heavy Oil Production with sand (CHOPS)
Pre-bid engineering for the production facility of CHOPS.
Year- 2011
Gas Compression and Gas Re-injection Project, GCP-GRIP
Project Management and Consultancy Services
Year- 2010
120 MBOPD Early Production Facility for Ratqa and Abdali-NK
Zero Flaring Study, Preparation of Operational, Safety, Quality and other procedures.
Year- 2010
Skid mounted 3-phase Separator.
Process and Mechanical Design
Year- 2010
Wet Utilities Distribution Network for Support services, Ras Laffan Industrial City
Front End Engineering and Design (FEED) & Detailed Engineering
Year- 2008
Detailed Engineering for Blow down study project
Hydraulic study and line sizing, piping GA drawings, isometric drawings, stress analysis
Year- 2007